Használati útmutató CyberPower BP72V60ART2U
CyberPower
nincs kategorizálva
BP72V60ART2U
Olvassa el alább 📖 a magyar nyelvű használati útmutatót CyberPower BP72V60ART2U (12 oldal) a nincs kategorizálva kategóriában. Ezt az útmutatót 5 ember találta hasznosnak és 3 felhasználó értékelte átlagosan 4.7 csillagra
Oldal 1/12

User’s Manual
BATTERY PACK
BP36V60ART2U
BP72V60ART2U
CyberPower Systems (USA), Inc.
4241 12th Avenue East Suite 400 Shakopee, MN 55379
Phone: 877-297-6937
Fax: 952-403-0009
www.CPSww.com
K01-0000248-02

Copyright © 2012 CyberPower Systems, Inc.
OVERVIEW
1
The CyberPower Battery packs (BP V60ART2U V ART2U) support A polarized plugs, and are designed for variety of CyberPower UPS systems. 36 / BP72 60 50
When combining with the UPS, the Battery pack provides extended runtime with a VDC/72VDC external connection. Additional parallel-connected Battery 36
packs provide the UPS for a longer extended runtime operation.
1K/1.5KVA or 2K/3KVA Battery pack
User’s manual Register card
Rackmount left rail Rackmount right rail
Power cord
Rackmount ears (Stands) (2)
Tie plate (1)
Flat head screws M5X8L (8) :
Pan head screws M5X12L 2) :(1
Plastic washers (8)
Screw hole dust covers ( ) 10
UNPACKING

Copyright © 2012 CyberPower Systems, Inc.
HARDWARE INSTALLATION
2
HARDWARE INSTALLATION
These versatile Battery packs can be mounted in a rackmount or vertical
tower orientation. This versatility is especially important to growing
organizations with changing needs that value having the option to
position a Battery pack on a floor or in a rackmount system. Please follow
the instructions below for the respective mounting methods.
SAFETY PRECAUTIONS
CAUTION! To prevent the risk of fire or electric shock, only use the
supplied hardware to attach the mounting brackets.
RACKMOUNT INSTALLATION
Step 1: Rackmount e s installation ar
Attach the two rackmount e s to the Battery pack using the provided ar
screws M5X8L*8pcs.
Step 2: Rackmount rail Installation
The rails adjust to mount in 48-cm (19-inch) panel racks from to 52
91.5cm (20.5 to inches) deep Select the proper holes in the rack for 36 .
positioning the Battery pack in the rack. The Battery pack takes up
position 1 through position 6.
Step 3 Adjust rackmount rails to fit your rack :
Attach the rackmount rail to your rack with two M5X12L screws and two
plastic washers at the front of the rack. (Located in position 1 & position 6)
Do not tighten the screws. Adjust the rail size on the rail assembly of your
rack. Secure the rail to the rear of the rack with two M5X12L screws and
two plastic washers. Tighten all screws at the front and rear of the rail.
Once completed, perform the same steps for assembling the other
rackmount rail.
Place the Battery pack on a flat stable surface with the front of the unit
facing toward you. Secure the Battery pack to your rack with four
M5X12L screws at the front of the rack. (Located in position 2 & position
5)
Once completed, perform the same steps for the UPS.
CAUTION! T Battery pack must be installed below the UPS.he
Termékspecifikációk
Márka: | CyberPower |
Kategória: | nincs kategorizálva |
Modell: | BP72V60ART2U |
Szüksége van segítségre?
Ha segítségre van szüksége CyberPower BP72V60ART2U, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek
Útmutatók nincs kategorizálva CyberPower
31 Március 2025
8 Január 2025
8 Január 2025
8 Január 2025
4 Január 2025
4 Január 2025
24 December 2024
13 Október 2024
11 Október 2024
10 Október 2024
Útmutatók nincs kategorizálva
- nincs kategorizálva DPA
- nincs kategorizálva Avid
- nincs kategorizálva Kalorik
- nincs kategorizálva Traco Power
- nincs kategorizálva Beringer
- nincs kategorizálva Tams Elektronik
- nincs kategorizálva Extralife Instruments
- nincs kategorizálva Fellow
- nincs kategorizálva Njoy
- nincs kategorizálva Capital Sports
- nincs kategorizálva Gardol
- nincs kategorizálva Neumärker
- nincs kategorizálva STI
- nincs kategorizálva Whirlwind
- nincs kategorizálva Sound Machines
Legújabb útmutatók nincs kategorizálva
10 Április 2025
10 Április 2025
10 Április 2025
9 Április 2025
9 Április 2025
9 Április 2025
9 Április 2025
9 Április 2025
9 Április 2025
9 Április 2025