Használati útmutató Dormakaba HSW-GP

Olvassa el alább 📖 a magyar nyelvű használati útmutatót Dormakaba HSW-GP (9 oldal) a nincs kategorizálva kategóriában. Ezt az útmutatót 19 ember találta hasznosnak és 10 felhasználó értékelte átlagosan 4.9 csillagra

Oldal 1/9
DORMA-Glas 800.52.069.6.32 Stand/Issue 02/03 Seite/Page 1/9
HSW-GP Installation instructions
Note: The as-delivered condition is indicated in the manufacturing drawing enclosed.
1. Ceiling substructure for track rail and installation of the track rail:
The track rail must be bolted over its entire length (including the stacking track area) to a correctly
aligned horizontal (longitudinally and transversely) ceiling steel substructure (e.g. DORMA substructure
system).
The steel substructure should be designed to accommodate the total weight of all the panels both in the
stacking area and in the partition section. The fixing point intervals for the track rail should be approx.
300 mm along the straight sections and approx. 100 mm in the stacking area.
Caution: All the track joints (except the maintenance end piece, Section 5, page 7) must be provided
with connection pins (a) in order to ensure a flush transition between the track sections and thus
smooth sliding panel operation. (Fig. 1)
a
Fig. 1
2. Mounting the glass panel fittings (Fig. 2A):
AMounting the single-point fixings to the glass:
Insert clamping collar (2) together with the tapered countersunk fastener (1) in the glass bore.
Place the intermediate layer (3) in the nut (4) and screw the nut onto the countersunk fastener. Using
the special wrench, pre-assemble and then tighten with a torque wrench (tightening torque = 15 Nm).

Termékspecifikációk

Márka: Dormakaba
Kategória: nincs kategorizálva
Modell: HSW-GP

Szüksége van segítségre?

Ha segítségre van szüksége Dormakaba HSW-GP, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek