Használati útmutató Draper Access E
                    Draper
                    
                    Vetítővászon
                    
                    Access E
                
                                
                
                
                                
                Olvassa el alább 📖 a magyar nyelvű használati útmutatót Draper Access E (4 oldal) a Vetítővászon kategóriában. Ezt az útmutatót 11 ember találta hasznosnak és 6 felhasználó értékelte átlagosan 5.0 csillagra
                        Oldal 1/4
                    
                    
                    
Remove Screws 
from both ends 
of Screen Housing
Access 
Panel Door 
pivot on Hinges
OPEN 
ACCESS 
PANEL
CLOSED 
ACCESS PANEL
SCREEN
HOUSING
ATTAC ACHING BR KETS
Insert pin in top 
slot and push up
Rotate bra tcke
clockwise to lo  ck
bra et in placeck
1
2
E  BNGAGEMENT RACKET
WITH  B  DALL ETENT
will snap into Access 
Panel Support Bra et.ck
ACCESS ANEL P  
SUPPORT RACKET B
CENTER of CASE
CENTER of CASE
Bottom Access Panel Installation/Removal
Bottom access panel is secured to the screen housing by two screws (one on 
each end), and is held in the closed position by engagement brackets with ball 
detents that snap into case support brackets.  
To remove the Access Panel:
1 Remove screws from both ends of screen housing (Fig. 4). 
2 Pull down on the access panel until the ball detents on the engagement 
  bracket have disengaged from the support bracket. 
3 2 Repeat Step   for all brackets along the length of the screen housing.
4 The access panel will be free to pivot downward. It will remain attached to  
  the lower inside edge of the screen housing by several steel hinges.  
Caution: For larger sizes Step   requires two people to perform safely.5
5 Press up on access panel and pull toward the front of the screen housing to  
  disengage hinges and remove access panel. 
To Remove/Install Support Brackets:
Installation/Operating Instructions
Access Electric Projection Screen by Draper
Copyright © 2016 Draper Inc.  Form Access_Inst16  Printed in U.S.A
Hanging Screen 
When locating viewing surface and checking clearance for screen operation, 
remember surface is centered in the length of the case. Regardless of 
mounting method used, the following points apply:  
1 Mounting brackets are shipped attached to the case. Engage each bracket  
  with top of housing as shown below and tighten set screws. 
2 Screen should be positively and securely supported so that vibration or  
  even abusive pulling on viewing surface will not weaken installation.
Please Note: A Hoisting Bracket is included on each end of the case to 
aid in overhead installation of the Access case.
3 Installer must insure that fasteners used are of adequate strength and   
  suitable for the mounting surface chosen. Supporting hardware (chains,  
  cables, 
3
/
8
" rods, etc.) must be essentially vertical.
4 Entire bottom of case must be readily accessible after installation is   
  complete.
5 Front, back and top of case must be straight— not forced to warp or bow. 
6 If case is painted on location, removal of roller/fabric assembly is   
  recommended prior to painting. If not removed, slot on bottom of case  
  should be shielded to protect viewing surface from paint splatters/overspray.
7 Do not seal unit in ceiling until electrical connections have been made and   
  screen has been operated successfully.
Electrical Connections
Screen operates on 110-120V, 60 hz., 1.1 amp current draw.  
Duty Cycle: ON 28 seconds /OFF 4 minutes.
Junction box is located just above the bottom access panel at left end of 
screen (standard, right end may be specified). 
Remove the bottom access panel for access to the junction box cover. (See 
Bottom Access Panel Removal instructions below). Remove two (2) hex head 
screws that secure the cover to the junction box to expose the red, black, and 
white pigtail leads and the green ground wire per wiring diagram on page 4.
If optional low voltage control is specified and factory installed, please refer to 
wiring diagrams on page 4.
Screen is shipped with internal wiring complete and control switch(es) fully 
boxed. Wire to connect screen to switch(es) and switch(es) to power supply 
should be furnished by installer. Connections should be made in accordance 
with attached wiring diagram, and wiring should comply with national and 
local electrical codes.
All operating switches should be “off” before power is connected.
Caution
1 Read instructions through completely before proceeding; keep them  
  for future reference. Follow instructions carefully. Installation contrary to  
  instructions invalidates warranty. Care in mounting and correct operation  
  will mean long and satisfactory service from your Draper screen.
2 Before removing screen from crate, check for damage and to make sure  
  all parts are included.
3 Allow enough access to remove front cover should fabric become  
  damaged or should other service be required.
4 Screen should be installed level (using a carpenter’s level).
5 Nothing should be fastened to screen dowel or viewing surface.
6 Operating switch(es) is packed separately in screen carton. Do not  
  discard with packing material.
7 Screen operates on 110-120V, 60 Hz. 1.1 amp current draw.
NOTE: Screen has been thoroughly inspected and tested at factory and  
found to be operating properly prior to shipment.
If you encounter any difficulties installing or servicing your Access screen, call your 
dealer or Draper, Inc., in Spiceland, Indiana, 765/987-7999 or fax 765/987-7142.
Suitable for use in environmental air space in accordance with Section 
300-22(c) of the National Electrical Code, and Sections 2-128, 12-010(3) and 
12-100 of the Canadian Electrical Code, Part 1, CSA C22.1.
Access case 
as seen from 
below
Bottom flange of 
Access housing
Bottom Access Panel Door
Caution: Beware of pinch points at ends of closure
US Patent Nos. 
6,137,629; 6,421,175; 
6,532,109; 6,816,308; 
7,559,707
These instructions are meant as a guide only. They do not imply any responsibility on the 
part of the manufacturer for improper installation or faulty workmanship at the jobsite.
1With typical installation, brackets may be angled to meet installation requirements. 
Typical 
Installation
1
7/8" 
ELECTRICAL
CUTOUT
Alternate  
Installation  
(additional set of  
brackets required  
but not included)
Figure Figure
Figure
Figure
Figure
Termékspecifikációk
| Márka: | Draper | 
| Kategória: | Vetítővászon | 
| Modell: | Access E | 
Szüksége van segítségre?
Ha segítségre van szüksége Draper Access E, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek
Útmutatók Vetítővászon Draper
                        
                         22 Szeptember 2024
                        
                    
                                                            
                        
                         6 Szeptember 2024
                        
                    
                                                            
                        
                         4 Szeptember 2024
                        
                    
                                                            
                        
                         7 Augusztus 2024
                        
                    
                                                            
                        
                         1 Augusztus 2024
                        
                    
                                                            
                        
                         31 Július 2024
                        
                    
                                                            
                        
                         31 Július 2024
                        
                    
                                                            
                        
                         30 Július 2024
                        
                    
                                                            
                        
                         29 Július 2024
                        
                    
                                                            
                        
                         29 Július 2024
                        
                    
                                                            Útmutatók Vetítővászon
- Vetítővászon Avers
 - Vetítővászon Luxburg
 - Vetítővászon ORAY
 - Vetítővászon Da-Lite
 - Vetítővászon NEC
 - Vetítővászon Elite Screens
 - Vetítővászon Lumene
 - Vetítővászon Elite
 - Vetítővászon Optoma
 - Vetítővászon Pyle
 - Vetítővászon Duronic
 - Vetítővászon Stewart
 - Vetítővászon Instaal
 - Vetítővászon Oregon Scientific
 - Vetítővászon GPX
 
Legújabb útmutatók Vetítővászon
                        
                         3 Április 2025
                        
                    
                                                            
                        
                         3 Április 2025
                        
                    
                                                            
                        
                         2 Április 2025
                        
                    
                                                            
                        
                         11 Október 2024
                        
                    
                                                            
                        
                         6 Október 2024
                        
                    
                                                            
                        
                         2 Október 2024
                        
                    
                                                            
                        
                         29 Szeptember 2024
                        
                    
                                                            
                        
                         29 Szeptember 2024
                        
                    
                                                            
                        
                         27 Szeptember 2024
                        
                    
                                                            
                        
                         26 Szeptember 2024