Használati útmutató Qubino ZMNHBA2 power relay
                    Qubino
                    
                    nincs kategorizálva
                    
                    ZMNHBA2 power relay
                
                                
                
                
                                
                Olvassa el alább 📖 a magyar nyelvű használati útmutatót Qubino ZMNHBA2 power relay (2 oldal) a nincs kategorizálva kategóriában. Ezt az útmutatót 11 ember találta hasznosnak és 6 felhasználó értékelte átlagosan 4.8 csillagra
                        Oldal 1/2
                    
                    
                    
Qubino 
The INNOVATIVE  SMALLEST and 
Flush 2 relays 
ORDERING CODE 
Z-WAVE FREQUENCY 
ZMNHBA2 
868,4 MHz 
ZMNHBA3 
921,4 MHz 
ZMNHBA4 
908,4 MHz 
ZMNHBA5 
869,0 MHz 
ZMNHBA6 
916,0 MHz 
This Z-Wave module is used for switching on or 
off two electrical devices (e.g. lights, fans, etc ...). 
The  module  can  be  controlled  either  through 
Z-Wave network or through the wall switches. 
The module is designed to be mounted inside a 
“ ”flush mounting box , hidden behind a traditional 
wall switch. 
Module  measures  power  consumption  of  two 
electrical  devices  and  supports  connection  of 
digital temperature  sensor.  It  is  designed  to  act 
as  repeater  in  order  to  improve  range  and 
stability of Z-wave network. 
Supported switches 
Module  supports    switches  (push mono-stable
button)  and    switches.  The module  is bi-stable
factory set to operate with bi-stable switches.   
Installation   
  Before  the  installation  disconnect  power 
supply. 
  Connect  the module  according to  electrical 
diagram.   
  Locate the antenna far from metal elements 
(as far as possible).   
  Do not shorten the antenna. 
Danger of electrocution!   
  Module installation requires a great degree of 
skill and may be performed only by a qualified 
and licensed electrician. 
  Even when the module is turned off, voltage 
may  be  present on  its  terminals.  Any works 
on  configuration  changes  related  to 
connection  mode  or  load  must  be  always 
performed  by  disconnected  power  supply 
(disable the fuse). 
Note! 
Do not  connect  the  module  to loads  exceeding 
recommended values.  Connect the  module only 
in  accordance  to  the below  diagrams.  Improper 
connections may be dangerous. 
Package contents 
  Flush 2 relays 
Electrical diagram 230VAC 
Notes for the diagram: 
Electrical diagram 24VDC   
Notes for the diagram: 
Durability of the device depends on applied load. 
For  resistive  load  (light  bulbs,  etc.)  and  4A 
current consumption of each individual electrical 
device, the durability exceeds 70.000 switches of 
each individual electrical device.   
Module  Inclusion  (Adding  to  Z-Wave 
network) 
  Connect  module  to  power  supply  (with 
temperature  sensor  connected  -  if 
purchased), 
  bring  module  within  maximum  1  meter  (3 
feet) of the main controller, 
  enable add/remove mode on main controller, 
  auto-inclusion  (30  minutes  after  connected 
to power supply) or 
  press service button   for more than    2   S
second   or
  press push button    three    times within 3s I1
(3  times  change  switch  state  within  3 
seconds) 
Module  Exclusion/Reset  (Removing 
from Z-Wave network) 
  Connect module to power supply   
  bring  module  within  maximum  1  meter  (3 
feet) of the main controller, 
  enable add/remove mode on main controller, 
  press  service  button    for  more  than  6 S
second or 
  press push button  five    times within 3s (5   I1 
  times change switch state within 3 seconds) 
in  the  first  60 seconds  after  the  module  is 
connected to the power supply. 
By this function all parameters of the module are 
set to  default values and own ID is deleted.    
If  service button  S  is  pressed  more than 2  and 
less  than  6second  module  is  excluded,  but 
configuration  parameters  are  not  set  to  default 
values 
    Association 
Association  enables  Flush  2  relays  module  to 
transfer  commands  inside  Z-Wave  network 
directly (without main controller) to other Z-Wave 
modules. 
Associated Groups: 
Group 1: basic on/off (triggered at change of the 
output Q1 state and reflecting its state) up to 16 
nodes. 
Group 2: basic on/off (triggered at change of the 
output Q2 state and reflecting its state) up to 16 
nodes. 
Group 3: default reporting group (reserved for the 
main controller). 
Configuration parameters 
Parameter no.   Input 1 switch type 1 –
Available configuration parameters  (data type  is 
1 Byte DEC): 
  default value 1 
  mono-stable switch type (push button) 0 
  -stable switch type   1 bi
Parameter no. 2   Input 2 switch type –
Available configuration parameters  (data type  is 
1 Byte DEC): 
  default value 1 
  mono-stable switch type (push button) 0 
  -stable switch type   1 bi
Parameter  no.  10  -  Activate  /  deactivate 
functions ALL ON/ALL OFF 
Available configuration parameters (data type  is 
1 Byte DEC): 
  default value 255 
  255 - ALL ON active, ALL OFF active. 
  -  ALL  ON is  not active  ALL  OFF  is  not 0 
active 
  - ALL ON is not active ALL OFF active 1 
  - ALL ON active ALL OFF is not active 2 
On/Off module responds to commands ALL ON / 
ALL OFF that may be sent by the main controller 
or by other controller belonging to the system.   
Parameter no. 11 - Automatic turning Off relay 
Q1 after set time   
Available configuration parameters  (data type  is 
2 Byte DEC): 
  Default value 0 
  - Auto OFF disabled   0 
  1- 65535 = 10mseconds   655,35 seconds–. 
Auto OFF enabled, with define time, step is 
10mseconds. 
Parameter no. 12 - Automatic turning Off relay 
Q2 after set time   
Available configuration parameters  (data type  is 
2 Byte DEC): 
  Default value 0 
  - Auto OFF disabled   0 
  1- 65535 = 10mseconds   655,35 seconds.   –
Auto OFF enabled, with define time, step is   
10mseconds. 
Parameter  no.  30  -  Saving  the  state  of  the 
relays Q1 and Q2 after a power failure 
Available configuration parameters (data type  is 
1 Byte DEC): 
  default value 0 
   Flush 2 relays module saves its state   0 –
before power failure (it returns to the last   
position saved before a power failure) 
  - Flush 2 relays module does not save the   1 
      state after a  er failure, it returns to "off" pow
position. 
Parameter  no.  40   Power  reporting in  Watts –
on power change for Q1 
Set value means percentage, set value from 0   –
N 
+VDC 
L 
-VDC 
Q1 
Output for electrical device no. 1 
Q2 
Output for electrical device no. 2 
I2 
Input for switch to control electrical 
device no.2 
I1 
Input  for  switch  to  control  electrical 
device no.1 
TS 
Terminal for digital temperature sensor 
(only  for  Flush  2  relays  module 
compatible  digital  temperature sensor, 
which must be ordered separately). 
N 
Neutral lead 
L 
Live lead 
Q1 
Output for electrical device no. 1 
Q2 
Output for electrical device no. 2 
I2 
Input for switch to control electrical 
device no.2 
I1 
Input  for  switch  to  control  electrical 
device no.1 
TS 
Terminal  for  digital  temperature  sensor 
(only  for  Flush  2  relays  module 
compatible  digital  temperature  sensor, 
which must be ordered separately). 
S 
Service button (used to 
add  or  remove module 
from  the  Z-Wave 
network). 
Termékspecifikációk
| Márka: | Qubino | 
| Kategória: | nincs kategorizálva | 
| Modell: | ZMNHBA2 power relay | 
Szüksége van segítségre?
Ha segítségre van szüksége Qubino ZMNHBA2 power relay, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek
Útmutatók nincs kategorizálva Qubino
                        
                         30 Augusztus 2024
                        
                    
                                                            
                        
                         25 Augusztus 2024
                        
                    
                                                            
                        
                         25 Augusztus 2024
                        
                    
                                                            
                        
                         25 Augusztus 2024
                        
                    
                                                            
                        
                         25 Augusztus 2024
                        
                    
                                                            
                        
                         25 Augusztus 2024
                        
                    
                                                            
                        
                         25 Augusztus 2024
                        
                    
                                                            Útmutatók nincs kategorizálva
- nincs kategorizálva Hagor
- nincs kategorizálva InAlto
- nincs kategorizálva Vroomshoop
- nincs kategorizálva Lamax
- nincs kategorizálva Eldom
- nincs kategorizálva NAV-TV
- nincs kategorizálva Austral
- nincs kategorizálva Milan
- nincs kategorizálva Vemer
- nincs kategorizálva Germania
- nincs kategorizálva Liemke
- nincs kategorizálva G3
- nincs kategorizálva Grothe
- nincs kategorizálva Thronmax
- nincs kategorizálva Cardo
Legújabb útmutatók nincs kategorizálva
                        
                         10 Április 2025
                        
                    
                                                            
                        
                         10 Április 2025
                        
                    
                                                            
                        
                         10 Április 2025
                        
                    
                                                            
                        
                         9 Április 2025
                        
                    
                                                            
                        
                         9 Április 2025
                        
                    
                                                            
                        
                         9 Április 2025
                        
                    
                                                            
                        
                         9 Április 2025
                        
                    
                                                            
                        
                         9 Április 2025
                        
                    
                                                            
                        
                         9 Április 2025
                        
                    
                                                            
                        
                         9 Április 2025